Forest Garden Shovelstrode · EV charging site
Forest Garden Shovelstrode
Shovelstrode Ln, East Grinstead, RH19
Forest Garden Shovelstrode is an EV charging site in East Grinstead, West Sussex, run by Forest Garden Shovelstrode and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is InstaVolt McDonald's East Grinstead (InstaVolt Ltd), 2 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Forest Garden Shovelstrode
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- - Charger 1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Forest Garden Shovelstrode?
Up to 7 kW AC via Type 2.
How many charging sockets does Forest Garden Shovelstrode have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Forest Garden Shovelstrode open 24/7?
Yes - Forest Garden Shovelstrode is open 24 hours a day, 7 days a week.
When is Forest Garden Shovelstrode busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Forest Garden Shovelstrode?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Forest Garden Shovelstrode?
Forest Garden Shovelstrode is on the Forest Garden Shovelstrode network.
Where is the nearest charger with 50 kW or more to Forest Garden Shovelstrode?
InstaVolt McDonald's East Grinstead (InstaVolt Ltd) is 2 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Forest Garden Shovelstrode?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Forest Garden Shovelstrode?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Forest Garden Shovelstrode?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chequer Mead Car Park, East Grinstead
- Vicarage Road Car Park 1
- Queensway Car Park 1
- InstaVolt McDonald's East Grinstead
- Norton House Car Park 1
- EVC Chartham Park
- Fastest nearby
- InstaVolt McDonald's East Grinstead · 160 kW · 2 mi