Connected Kerb · EV charging site
North Street Car Park
6 North St, Scarborough, YO11 1DE
North Street Car Park is an EV charging site in Scarborough, North Yorkshire, run by Connected Kerb. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as 50p per kW. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pavilion Car Park (InstaVolt Ltd), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- 50p per kW(from Open Charge Map, 12 Nov 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at North Street Car Park (Connected Kerb)?
The listed price is 50p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at North Street Car Park (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does North Street Car Park (Connected Kerb) have?
1 charging socket: 2 × 7 kW Type 2, 2 × 22 kW Type 2.
Who operates North Street Car Park?
North Street Car Park is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to North Street Car Park (Connected Kerb)?
Pavilion Car Park (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Street Car Park (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Street Car Park (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Street Car Park (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- St Thomas Street Car Park
- Friars Way Car Park
- North Terrace Car Park
- Brunswick Shopping Centre
- Pavilion Car Park
- Eastborough Car Park
- Fastest nearby
- Pavilion Car Park · 120 kW · 0.3 mi