Connected Kerb · EV charging site
North Terrace Car Park
North Terrace, Scarborough, YO11 1TQ
North Terrace Car Park is an EV charging site in Scarborough, North Yorkshire, run by Connected Kerb. It has a single 7 kW Type 2 socket, and the price is listed as 50p per kW. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pavilion Car Park (InstaVolt Ltd), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- 50p per kW(from Open Charge Map, 12 Nov 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at North Terrace Car Park (Connected Kerb)?
The listed price is 50p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at North Terrace Car Park (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does North Terrace Car Park (Connected Kerb) have?
1 charging socket: 2 × 7 kW Type 2.
Who operates North Terrace Car Park?
North Terrace Car Park is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to North Terrace Car Park (Connected Kerb)?
Pavilion Car Park (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Terrace Car Park (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Terrace Car Park (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Terrace Car Park (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Friars Way Car Park
- St Thomas Street Car Park
- North Street Car Park
- Eastborough Car Park
- Brunswick Shopping Centre
- Pavilion Car Park
- Fastest nearby
- Pavilion Car Park · 120 kW · 0.4 mi