Connected Kerb · EV charging site
Parc Bryn Bach
Merthyr Road, Ebbw Vale, NP22 3AY
Parc Bryn Bach is an EV charging site in Ebbw Vale, Blaenau Gwent, run by Connected Kerb. Both of its sockets are 22 kW Type 2, and the price is listed as £0.53/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Ebbw Vale (GeniePoint), 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- £0.53/kWh(from Open Charge Map, 10 Feb 2025)
- Getting there
- car park accessible daylight hours only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Parc Bryn Bach (Connected Kerb)?
The listed price is £0.53/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Parc Bryn Bach (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does Parc Bryn Bach (Connected Kerb) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Parc Bryn Bach?
Parc Bryn Bach is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Parc Bryn Bach (Connected Kerb)?
Morrisons Ebbw Vale (GeniePoint) is 2.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Parc Bryn Bach (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Parc Bryn Bach (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Parc Bryn Bach (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Bevan Health and Wellbeing Centre
- Glanhowy Primary School, Tredegar
- Gwent Shopping Centre CarPark, Blaenau Gwent
- Tredegar Business Park
- Ael- Y-Bryn
- Lower Salisbury Street Car Park
- Cheapest nearby
- Pod Point Bevan Health and Wellbeing Centre · 21.6p per kWh · 7 kW · 1 mi