Connected Kerb · EV charging site
Park View Car Park 1, West Gate, Haltwhisle
West Gate, Haltwhistle, NE49 9AR
Park View Car Park 1, West Gate, Haltwhisle is an EV charging site in Haltwhistle, Northumberland, run by Connected Kerb. All 4 of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Railway Station Car Park (BP Pulse), 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Park View Car Park 1, West Gate, Haltwhisle?
Park View Car Park 1, West Gate, Haltwhisle is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb)?
Railway Station Car Park (BP Pulse) is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park View Car Park 1, West Gate, Haltwhisle (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Railway Station Car Park
- Haltwhistle leisure pool
- Endens Lawn Service Station
- Cawfields Car Park
- Cawfields Car Park
- Northumberland National Park
- Cheapest nearby
- Railway Station Car Park · 89p per kWh · 50 kW · 130 yd
- Fastest nearby
- Railway Station Car Park · 50 kW · 130 yd