Fuuse · EV charging site
Endens Lawn Service Station
Bypass Road, Haltwhistle, NE49 0HH
Endens Lawn Service Station is an EV charging site in Haltwhistle, Northumberland, run by Fuuse. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Railway Station Car Park (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Endens Lawn Service Station (Fuuse)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Endens Lawn Service Station (Fuuse) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Endens Lawn Service Station?
Endens Lawn Service Station is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to Endens Lawn Service Station (Fuuse)?
Railway Station Car Park (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Endens Lawn Service Station (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Endens Lawn Service Station (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Endens Lawn Service Station (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Park View Car Park 1, West Gate, Haltwhisle
- Railway Station Car Park
- Haltwhistle leisure pool
- Cawfields Car Park
- Cawfields Car Park
- Northumberland National Park
- Cheapest nearby
- Railway Station Car Park · 89p per kWh · 50 kW · 0.2 mi