Connected Kerb · EV charging site
Pencoed Railway Station Park & Ride 1
Pencoed Railway Station Park & Ride, Coity, CF35 6YT
Pencoed Railway Station Park & Ride 1 is an EV charging site in Coity, Bridgend county borough, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Cherry Laurel, Bridgend (Osprey Charging), 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Pencoed Railway Station Park & Ride 1 (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pencoed Railway Station Park & Ride 1 (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Pencoed Railway Station Park & Ride 1?
Pencoed Railway Station Park & Ride 1 is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Pencoed Railway Station Park & Ride 1 (Connected Kerb)?
Cherry Laurel, Bridgend (Osprey Charging) is 2.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pencoed Railway Station Park & Ride 1 (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pencoed Railway Station Park & Ride 1 (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pencoed Railway Station Park & Ride 1 (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hcc Bridgend Tokio Marine 1
- High Street, Heol-y-Cyw
- Cherry Laurel, Bridgend
- Pod Point Oak Tree Surgery
- Llanharan Railway Station Park and Ride
- Bridgend, UK
- Cheapest nearby
- Pod Point Oak Tree Surgery · 44.4p per kWh · 7 kW · 2.7 mi
- Fastest nearby
- Bridgend, UK · 250 kW · 3.1 mi