ChargePoint · EV charging site
Hcc Bridgend Tokio Marine 1
Tokio Marine Unit 6, Bocam Park, Coity, CF35 5LJ
Hcc Bridgend Tokio Marine 1 is an EV charging site in Coity, Bridgend county borough, run by ChargePoint. It has a single 22 kW Type 2 socket. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Cherry Laurel, Bridgend (Osprey Charging), 1.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hcc Bridgend Tokio Marine 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Hcc Bridgend Tokio Marine 1 (ChargePoint) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Hcc Bridgend Tokio Marine 1?
Hcc Bridgend Tokio Marine 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Hcc Bridgend Tokio Marine 1 (ChargePoint)?
Cherry Laurel, Bridgend (Osprey Charging) is 1.6 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hcc Bridgend Tokio Marine 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hcc Bridgend Tokio Marine 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hcc Bridgend Tokio Marine 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pencoed Railway Station Park & Ride 1
- Cherry Laurel, Bridgend
- Pod Point Oak Tree Surgery
- High Street, Heol-y-Cyw
- Bassett's Nissan Bridgend
- Pod Point Tesco Extra - Bridgend
- Cheapest nearby
- Pod Point Oak Tree Surgery · 44.4p per kWh · 7 kW · 2.4 mi
- Fastest nearby
- Cherry Laurel, Bridgend · 75 kW · 1.6 mi