Nissan UK Dealer Network · EV charging site
Bassett's Nissan Bridgend
South Road, Bridgend, CF31 3UL
Bassett's Nissan Bridgend is an EV charging site in Bridgend, Bridgend county borough, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cherry Laurel, Bridgend (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 13 Dec 2016)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bassett's Nissan Bridgend (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Bassett's Nissan Bridgend?
Bassett's Nissan Bridgend is on the Nissan UK Dealer Network network.
Can anyone charge at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
Cherry Laurel, Bridgend (Osprey Charging) is 1.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bassett's Nissan Bridgend (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Bridgend
- Five Bells
- Best Western Heronston Hotel & Leisure Club
- Pod Point Oak Tree Surgery
- Brackla Street, Bridgend
- Tremains Road Car Park, Bridgend
- Cheapest nearby
- Pod Point Tesco Extra - Bridgend · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Five Bells · 22 kW · 0.7 mi