Zero Carbon World · EV charging site
Best Western Heronston Hotel & Leisure Club
Ewenny Road, Bridgend, CF35 5AW
Best Western Heronston Hotel & Leisure Club is an EV charging site in Bridgend, Bridgend county borough, run by Zero Carbon World. It has a single 7 kW Type 2 socket. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Llangewydd Arms, Broadlands (Osprey Charging), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01656 668811
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Heronston Hotel & Leisure Club (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Best Western Heronston Hotel & Leisure Club (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Best Western Heronston Hotel & Leisure Club?
Best Western Heronston Hotel & Leisure Club is on the Zero Carbon World network. For site issues, the operator lists 01656 668811.
Where is the nearest charger with 50 kW or more to Best Western Heronston Hotel & Leisure Club (Zero Carbon World)?
Llangewydd Arms, Broadlands (Osprey Charging) is 1.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Heronston Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Heronston Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Heronston Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Bridgend
- Five Bells
- Bassett's Nissan Bridgend
- Brackla Street, Bridgend
- Tremains Road Car Park, Bridgend
- Tondu Road Car Park, Bridgend
- Cheapest nearby
- Pod Point Tesco Extra - Bridgend · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Five Bells · 22 kW · 0.6 mi