Connected Kerb · EV charging site
Rivermead Centre Car Park, Newport
Rivermead Centre Car Par, Risca, NP10 9LZ
Rivermead Centre Car Park, Newport is an EV charging site in Risca, Caerphilly County Borough, run by Connected Kerb. Both of its sockets are 22 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is InstaVolt McDonald's Meadowland (InstaVolt Ltd), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Rivermead Centre Car Park, Newport (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does Rivermead Centre Car Park, Newport (Connected Kerb) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Rivermead Centre Car Park, Newport?
Rivermead Centre Car Park, Newport is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Rivermead Centre Car Park, Newport (Connected Kerb)?
InstaVolt McDonald's Meadowland (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rivermead Centre Car Park, Newport (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rivermead Centre Car Park, Newport (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rivermead Centre Car Park, Newport (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NP10 9LG
- InstaVolt McDonald's Meadowland
- Azalea Road
- Rogerstone
- Co-op Rogerstone
- Pod Point Tesco Extra - Risca
- Cheapest nearby
- Pod Point Tesco Extra - Risca · 44.4p per kWh · 50 kW · 1.3 mi
- Fastest nearby
- InstaVolt McDonald's Meadowland · 120 kW · 0.3 mi