VIRTA · EV charging site
Rogerstone
Rogerstone, Newport, NP10 9NA
Rogerstone is an EV charging site in Newport, run by VIRTA. It has a single socket, with CCS at up to 100 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Co-op Rogerstone (Be.EV), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- VIRTA
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.63/kWh; other tariffs available(from Open Charge Map, 15 Apr 2022)
- Phone (from Open Charge Map)
- 0800-02200
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Rogerstone (VIRTA)?
The listed price is £0.63/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Rogerstone (VIRTA)?
Up to 100 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Rogerstone (VIRTA) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 100 kW CCS, 1 × 62 kW CHAdeMO.
Who operates Rogerstone?
Rogerstone is on the VIRTA network. For site issues, the operator lists 0800-02200.
Where is the nearest other charger with 50 kW or more to Rogerstone (VIRTA)?
Co-op Rogerstone (Be.EV) is 10 yards away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rogerstone (VIRTA)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rogerstone (VIRTA)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rogerstone (VIRTA)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Co-op Rogerstone
- Pye Corner Railway Station
- NP10 9LG
- Rivermead Centre Car Park, Newport
- InstaVolt McDonald's Meadowland
- Azalea Road
- Cheapest nearby
- Co-op Rogerstone · 84p per kWh · 100 kW · 10 yd
- Fastest nearby
- InstaVolt McDonald's Meadowland · 120 kW · 1.3 mi