Dragon Charging · EV charging site
Pye Corner Railway Station
Western Valley Road, Newport, NP10 9DU
Pye Corner Railway Station is an EV charging site in Newport, run by Dragon Charging. Both of its sockets are 22 kW Type 2, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Co-op Rogerstone (Be.EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Dragon Charging
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.65/kWh(from Open Charge Map, 29 Jan 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pye Corner Railway Station (Dragon Charging)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pye Corner Railway Station (Dragon Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Pye Corner Railway Station (Dragon Charging) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Pye Corner Railway Station?
Pye Corner Railway Station is on the Dragon Charging network.
Where is the nearest charger with 50 kW or more to Pye Corner Railway Station (Dragon Charging)?
Co-op Rogerstone (Be.EV) is 0.5 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pye Corner Railway Station (Dragon Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pye Corner Railway Station (Dragon Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pye Corner Railway Station (Dragon Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Co-op Rogerstone
- Rogerstone
- Gaer Community Centre
- Ridgeway, Newport
- Tredegar Park, Newport
- Lidl-Cardiff Road
- Cheapest nearby
- Co-op Rogerstone · 84p per kWh · 100 kW · 0.5 mi
- Fastest nearby
- Co-op Rogerstone · 100 kW · 0.5 mi