Connected Kerb · EV charging site
Victoria Park Community Centre, Barry
Victoria Park Community Centre, Barry, CF63 1JY
Victoria Park Community Centre, Barry is an EV charging site in Barry, Vale of Glamorgan, run by Connected Kerb. Both of its sockets are 22 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is InstaVolt Waterfront Retail Park (InstaVolt Ltd), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Victoria Park Community Centre, Barry (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does Victoria Park Community Centre, Barry (Connected Kerb) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Victoria Park Community Centre, Barry?
Victoria Park Community Centre, Barry is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Victoria Park Community Centre, Barry (Connected Kerb)?
InstaVolt Waterfront Retail Park (InstaVolt Ltd) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Victoria Park Community Centre, Barry (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Victoria Park Community Centre, Barry (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Victoria Park Community Centre, Barry (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.