Drax Energy Solutions Limited · EV charging site
DRAX00227
Malthouse Avenue, Barry, CF23 8RA
DRAX00227 is an EV charging site at Malthouse Avenue in Barry, Vale of Glamorgan, run by Drax Energy Solutions Limited. Both of its sockets are 22 kW Type 2. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is InstaVolt Waterfront Retail Park (InstaVolt Ltd), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Drax Energy Solutions Limited
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at DRAX00227 (Drax Energy Solutions Limited)?
Up to 22 kW AC via Type 2.
How many charging sockets does DRAX00227 (Drax Energy Solutions Limited) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates DRAX00227?
DRAX00227 is on the Drax Energy Solutions Limited network.
Where is the nearest charger with 50 kW or more to DRAX00227 (Drax Energy Solutions Limited)?
InstaVolt Waterfront Retail Park (InstaVolt Ltd) is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at DRAX00227 (Drax Energy Solutions Limited)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DRAX00227 (Drax Energy Solutions Limited)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at DRAX00227 (Drax Energy Solutions Limited)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.