EV charging site
Crowne Plaza Battersea
Bridges Court, Latchmere, SW11 3BE
Crowne Plaza Battersea is an EV charging site in Latchmere, Greater London. Both of its sockets are 7 kW Type 2, and charging is listed as free. 494 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sainsburys Fulham Wharf (Smart Charge by Sainsbury's), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 22 Aug 2016)
- Phone (from Open Charge Map)
- 02078013500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Crowne Plaza Battersea?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Crowne Plaza Battersea?
Up to 7 kW AC via Type 2.
How many charging sockets does Crowne Plaza Battersea have?
2 charging sockets: 2 × 7 kW Type 2.
Can anyone charge at Crowne Plaza Battersea?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Crowne Plaza Battersea?
Sainsburys Fulham Wharf (Smart Charge by Sainsbury's) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Crowne Plaza Battersea?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Crowne Plaza Battersea?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Crowne Plaza Battersea?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Lavender Road · 22 kW · 0.2 mi