Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

DAERA Portal Control · EV charging site

DAERA Portal Control

58 Newry Rd, BT34 3LH

DAERA Portal Control is an EV charging site in Newry, Newry Mourne and Down, run by DAERA Portal Control and open 24 hours a day. All 4 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 16 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Hill Street (ESB Ecars), 5.9 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from DAERA Portal Control’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW4 connectors4 free
ROLEC_DLL52018-1100% reliabilityAvailable
ROLEC_DLL52065-1100% reliabilityAvailable
ROLEC_DLL52132-1100% reliabilityAvailable
ROLEC_DLL52288-1100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
ROLEC_DLL52018-1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at DAERA Portal Control?

Up to 7 kW AC via Type 2.

How many charging sockets does DAERA Portal Control have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is DAERA Portal Control open 24/7?

Yes - DAERA Portal Control is open 24 hours a day, 7 days a week.

When is DAERA Portal Control busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is DAERA Portal Control?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 16 observed charging sessions.

Who operates DAERA Portal Control?

DAERA Portal Control is on the DAERA Portal Control network.

Where is the nearest charger with 50 kW or more to DAERA Portal Control?

Hill Street (ESB Ecars) is 5.9 miles away in a straight line, with up to 100 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DAERA Portal Control?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: DAERA Portal Control · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.