Kellys group · EV charging site
Kellys group
Milltown East Industrial Estate, Newry, BT34 3PN
Kellys group is an EV charging site in Newry, Newry Mourne and Down, run by Kellys group and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 32 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Hill Street (ESB Ecars), 4.9 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Kellys group
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- Kellys Group A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kellys group?
Up to 22 kW AC via Type 2.
How many charging sockets does Kellys group have?
2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Kellys group open 24/7?
Yes - Kellys group is open 24 hours a day, 7 days a week.
When is Kellys group busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Kellys group?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 32 observed charging sessions.
Who operates Kellys group?
Kellys group is on the Kellys group network.
Where is the nearest charger with 50 kW or more to Kellys group?
Hill Street (ESB Ecars) is 4.9 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kellys group?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kellys group?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kellys group?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.