EV charging site
Doubletree by Hilton Westerwood
1 St Andrews Drive, Cumbernauld, G68 0EW
Doubletree by Hilton Westerwood is an EV charging site in Cumbernauld, North Lanarkshire. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Power Networks Demonstration Centre, Wardpark (Chargeplace Scotland), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 8 Jul 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Doubletree by Hilton Westerwood?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Doubletree by Hilton Westerwood?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Doubletree by Hilton Westerwood have?
4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 2 × 7 kW Type 2.
Where is the nearest other charger with 50 kW or more to Doubletree by Hilton Westerwood?
Power Networks Demonstration Centre, Wardpark (Chargeplace Scotland) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Doubletree by Hilton Westerwood?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Doubletree by Hilton Westerwood?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Doubletree by Hilton Westerwood?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Power Networks Demonstration Centre, Wardpark
- Bron Way Car Park
- Antonine Shopping Centre - 0115
- Arnold Clark Cumbernauld Kia
- S Carbrain Road
- Ravenswood Pitches
- Cheapest nearby
- Antonine Shopping Centre - 0115 · 65p per kWh · 50 kW · 1.6 mi
- Fastest nearby
- Arnold Clark Cumbernauld Kia · 150 kW · 1.7 mi