Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

E.ON Drive · EV charging site

Starbucks

Connect Way, Thorne, DN8 5GS

Starbucks is an EV charging site in Thorne, Doncaster, run by E.ON Drive. It has a single socket, with CCS at up to 300 kW. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Doncaster North (GRIDSERVE), 120 yards away.

Status

Out of service

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 31 Aug 2026Last verified 31 Aug 2026

Connectors

CCS · 300 kW2 connectors

Site information

Operator
E.ON Drive
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Starbucks (E.ON Drive)?

Up to 300 kW DC via CCS.

How many charging sockets does Starbucks (E.ON Drive) have?

1 charging socket: 1 × 300 kW CCS, 1 × 300 kW CCS.

Who operates Starbucks?

Starbucks is on the E.ON Drive network.

Where is the nearest other charger with 50 kW or more to Starbucks (E.ON Drive)?

EH - MOTO Doncaster North (GRIDSERVE) is 120 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks (E.ON Drive)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks (E.ON Drive)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks (E.ON Drive)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 31 Aug 2026