E.ON Drive · EV charging site
The Wishing Well
Oakney Wood Drive, Selby, YO8 8LZ
The Wishing Well is an EV charging site in Selby, North Yorkshire, run by E.ON Drive. All 6 of its sockets are 300 kW CCS. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is JET Abbeyside Filling Station, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- E.ON Drive
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Wishing Well (E.ON Drive)?
Up to 300 kW DC via CCS.
How many charging sockets does The Wishing Well (E.ON Drive) have?
6 charging sockets: 6 × 300 kW CCS.
Who operates The Wishing Well?
The Wishing Well is on the E.ON Drive network.
Where is the nearest other charger with 50 kW or more to The Wishing Well (E.ON Drive)?
JET Abbeyside Filling Station is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Wishing Well (E.ON Drive)?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Wishing Well (E.ON Drive)?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Wishing Well (E.ON Drive)?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.