Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

JET Abbeyside Filling Station

1 Bawtry Road Abbeyside, Selby, YO8 8NA

JET Abbeyside Filling Station is an EV charging site in Selby, North Yorkshire. It has a single socket, with CCS at up to 150 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Selby (MFG EV Power), 0.6 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 22 Jan 2024Last verified 22 Jan 2024

Connectors

CCS · 150 kW3 connectors
CHAdeMO · 100 kW3 connectors

Site information

Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at JET Abbeyside Filling Station?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does JET Abbeyside Filling Station have?

1 charging socket: 3 × 150 kW CCS, 3 × 100 kW CHAdeMO.

Where is the nearest other charger with 50 kW or more to JET Abbeyside Filling Station?

Morrisons Selby (MFG EV Power) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at JET Abbeyside Filling Station?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at JET Abbeyside Filling Station?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at JET Abbeyside Filling Station?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 22 Jan 2024

Amp Map does not take payment. You pay the operator.