Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - IKEA Leeds

Holden Ing Way, Morley, WF17 9AE

EH - IKEA Leeds is an EV charging site in Morley, City and Borough of Leeds, run by GRIDSERVE and open 24 hours a day. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 326 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Birstall Woodhead Road (Source EV), 0.3 miles away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW3 connectors · 85p per kWh2 free1 in use
#1100% reliabilityCharging
#3100% reliabilityAvailable
#4100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 85p per kWh1 free
#2100% reliabilityAvailable
Type 2 · 11 kW1 connector · 59p per kWh1 free
#5100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card
Getting there
IKEA Leeds Car Park

Facilities

Supermarket

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW85p per kWh
CHAdeMO50 kW85p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - IKEA Leeds (GRIDSERVE)?

The listed price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - IKEA Leeds (GRIDSERVE)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - IKEA Leeds (GRIDSERVE) have?

5 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is EH - IKEA Leeds (GRIDSERVE) open 24/7?

Yes - EH - IKEA Leeds (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - IKEA Leeds (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - IKEA Leeds (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 326 observed charging sessions.

Who operates EH - IKEA Leeds?

EH - IKEA Leeds is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - IKEA Leeds (GRIDSERVE)?

Birstall Woodhead Road (Source EV) is 0.3 miles away in a straight line, with up to 320 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - IKEA Leeds (GRIDSERVE)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - IKEA Leeds (GRIDSERVE)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - IKEA Leeds (GRIDSERVE)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.