Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Source EV · EV charging site

Birstall Woodhead Road

LIDL Birstall Woodhead Road, Morley, WF17 9TB

Birstall Woodhead Road is an EV charging site in Morley, City and Borough of Leeds, run by Source EV and open 24 hours a day. All 12 of its sockets are 320 kW CCS, and the published price is £0.90 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 176 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - IKEA Leeds (GRIDSERVE), 0.3 miles away.

Status

5 of 12 available

Checking status…

VerifiedLive status and details from Source EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 320 kW12 connectors · 90p per kWh5 free3 in use4 status unknown
SGB0200-CCS1100% reliabilityAvailable
SGB0200-CCS2100% reliabilityCharging
SGB0201-CCS1100% reliabilityStatus unknown
SGB0201-CCS2100% reliabilityStatus unknown
SGB0201-CCS3100% reliabilityStatus unknown
SGB0201-CCS4100% reliabilityStatus unknown
SGB0202-CCS1100% reliabilityAvailable
SGB0202-CCS2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Source EV
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the SourceConnect appRFID card
Charger ID
SGB0200-CCS1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS320 kW90p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 320 kW CCS~21 min · ≈ 55 kWh · ~£50
Tesla Model 3 Rear-Wheel Drive 10–80% · 320 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 320 kW CCS~39 min · ≈ 51 kWh · ~£46
Hyundai IONIQ 5 10–80% · 320 kW CCS~18 min · ≈ 51 kWh · ~£46
MG Motor MG4 Trophy 10–80% · 320 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 320 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Birstall Woodhead Road (Source EV)?

The listed price is £0.90/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Birstall Woodhead Road (Source EV)?

Up to 320 kW DC via CCS.

How many charging sockets does Birstall Woodhead Road (Source EV) have?

12 charging sockets: 12 × 320 kW CCS. Live per-socket availability is shown on this page.

Is Birstall Woodhead Road (Source EV) open 24/7?

Yes - Birstall Woodhead Road (Source EV) is open 24 hours a day, 7 days a week.

When is Birstall Woodhead Road (Source EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Birstall Woodhead Road (Source EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 176 observed charging sessions.

Who operates Birstall Woodhead Road?

Birstall Woodhead Road is on the Source EV network.

Where is the nearest other charger with 50 kW or more to Birstall Woodhead Road (Source EV)?

EH - IKEA Leeds (GRIDSERVE) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Birstall Woodhead Road (Source EV)?

A typical 10–80% rapid charge takes about 21 min on the 320 kW CCS here, adding roughly 55 kWh (~£50 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Birstall Woodhead Road (Source EV)?

A typical 10–80% rapid charge takes about 23 min on the 320 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Birstall Woodhead Road (Source EV)?

A typical 10–80% rapid charge takes about 39 min on the 320 kW CCS here, adding roughly 51 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.