Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Mollies Buckland

Shrivenham Rd, A420, Carterton, SN7 8PY

HU - Mollies Buckland is an EV charging site in Carterton, Oxfordshire, run by GRIDSERVE and open 24 hours a day. Its 8 sockets reach up to 180 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 772 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is InstaVolt Marcham Road (InstaVolt Ltd), 5.8 miles away.

Status

7 of 8 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 180 kW5 connectors · 92p per kWh5 free
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#7100% reliabilityAvailable
CCS · 100 kW1 connector · 92p per kWh1 in use
#1100% reliabilityCharging
CHAdeMO · 80 kW1 connector · 92p per kWh1 free
#8100% reliabilityAvailable
CHAdeMO · 75 kW1 connector · 92p per kWh1 free
#299% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

HotelRestaurantCaféSupermarketFuel stationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS180 kW92p per kWh
CCS100 kW92p per kWh
CHAdeMO80 kW92p per kWh
CHAdeMO75 kW92p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Mollies Buckland (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Mollies Buckland (GRIDSERVE)?

Up to 180 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Mollies Buckland (GRIDSERVE) have?

8 charging sockets: 1 × 100 kW CCS, 1 × 75 kW CHAdeMO, 5 × 180 kW CCS, 1 × 80 kW CHAdeMO. Live per-socket availability is shown on this page.

Is HU - Mollies Buckland (GRIDSERVE) open 24/7?

Yes - HU - Mollies Buckland (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Mollies Buckland (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Mollies Buckland (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 772 observed charging sessions.

Who operates HU - Mollies Buckland?

HU - Mollies Buckland is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Mollies Buckland (GRIDSERVE)?

InstaVolt Marcham Road (InstaVolt Ltd) is 5.8 miles away in a straight line, with up to 125 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Mollies Buckland (GRIDSERVE)?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Mollies Buckland (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Mollies Buckland (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.