Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Mollies Buckland - Patrons

Shrivenham Rd - A420, Carterton, SN7 8PY

HU - Mollies Buckland - Patrons is an EV charging site in Carterton, Oxfordshire, run by GRIDSERVE and open 24 hours a day. All 14 of its sockets are 11 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 100% uptime and recorded 114 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is HU - Mollies Buckland (GRIDSERVE), 40 yards away.

Status

12 of 14 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 11 kW14 connectors · 59p per kWh12 free2 in use
#1100% reliabilityAvailable
#2100% reliabilityCharging
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

HotelRestaurantCaféSupermarketFuel stationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 11 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 11 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 11 kW Type 2~4h 39m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 11 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 11 kW Type 2~3h 53m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 11 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 11 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Mollies Buckland - Patrons (GRIDSERVE)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Mollies Buckland - Patrons (GRIDSERVE)?

Up to 11 kW AC via Type 2.

How many charging sockets does HU - Mollies Buckland - Patrons (GRIDSERVE) have?

14 charging sockets: 14 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is HU - Mollies Buckland - Patrons (GRIDSERVE) open 24/7?

Yes - HU - Mollies Buckland - Patrons (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Mollies Buckland - Patrons (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 3 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Mollies Buckland - Patrons (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 114 observed charging sessions.

Who operates HU - Mollies Buckland - Patrons?

HU - Mollies Buckland - Patrons is on the GRIDSERVE network.

Where is the nearest charger with 50 kW or more to HU - Mollies Buckland - Patrons (GRIDSERVE)?

HU - Mollies Buckland (GRIDSERVE) is 40 yards away in a straight line, with up to 180 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Mollies Buckland - Patrons (GRIDSERVE)?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Mollies Buckland - Patrons (GRIDSERVE)?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Mollies Buckland - Patrons (GRIDSERVE)?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.