GRIDSERVE · EV charging site
EH - MOTO Wetherby
46 A1M, Harrogate, LS22 5GT
EH - MOTO Wetherby is an EV charging site in Harrogate, North Yorkshire, run by GRIDSERVE and open 24 hours a day. Its 32 sockets reach up to 360 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 97% uptime and recorded 12378 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is The Cluster of Nuts, Wetherby (GeniePoint), 1.4 miles away.
Status
9 of 32 available
Checking status…
Connectors
CCS · 360 kW
CCS · 350 kW
CCS or CHAdeMO · 350 kW
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 360 kW | 92p per kWh |
| CCS | 350 kW | 92p per kWh |
| CHAdeMO | 100 kW | 92p per kWh |
| CCS | 50 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Wetherby (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Wetherby (GRIDSERVE)?
Up to 360 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Wetherby (GRIDSERVE) have?
32 charging sockets: 5 × 50 kW CCS, 1 × 50 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 12 × 360 kW CCS, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is EH - MOTO Wetherby (GRIDSERVE) open 24/7?
Yes - EH - MOTO Wetherby (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Wetherby (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Wetherby (GRIDSERVE)?
Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 12378 observed charging sessions.
Who operates EH - MOTO Wetherby?
EH - MOTO Wetherby is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Wetherby (GRIDSERVE)?
The Cluster of Nuts, Wetherby (GeniePoint) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Wetherby (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Wetherby (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Wetherby (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.