GeniePoint · EV charging site
The Cluster of Nuts, Wetherby
Wetherby, Harrogate, LS22 6JL
The Cluster of Nuts, Wetherby is an EV charging site in Harrogate, North Yorkshire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Cluster of Nuts Car Park (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Cluster of Nuts, Wetherby (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does The Cluster of Nuts, Wetherby (GeniePoint) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates The Cluster of Nuts, Wetherby?
The Cluster of Nuts, Wetherby is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to The Cluster of Nuts, Wetherby (GeniePoint)?
The Cluster of Nuts Car Park (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Cluster of Nuts, Wetherby (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Cluster of Nuts, Wetherby (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Cluster of Nuts, Wetherby (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Cluster of Nuts Car Park
- Crossley Street Car Park
- Aldi, Wetherby
- EH - MOTO Wetherby
- Collingham & Linton Sports Association
- Boston Spa High Street
- Cheapest nearby
- EH - MOTO Wetherby · 59p per kWh · 360 kW · 1.4 mi
- Fastest nearby
- EH - MOTO Wetherby · 360 kW · 1.4 mi