Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - Roadchef Killington Lakes

M6, Kendal, LA8 0NW

EH - Roadchef Killington Lakes is an EV charging site in Kendal, Cumbria, run by GRIDSERVE and open 24 hours a day. Its 11 sockets reach up to 240 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 98% uptime and recorded 1949 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Murley Moss Business Park (Fuuse), 4 miles away.

Status

11 of 11 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 240 kW6 connectors · 92p per kWh6 free
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityAvailable
#999% reliabilityAvailable
#10100% reliabilityAvailable
#1199% reliabilityAvailable
CCS · 40 kW3 connectors · 92p per kWh3 free
#196% reliabilityAvailable
#497% reliabilityAvailable
#598% reliabilityAvailable
CHAdeMO · 40 kW1 connector · 92p per kWh1 free
#292% reliabilityAvailable
Type 2 · 22 kW1 connector · 92p per kWh1 free
#397% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card
Getting there
In the carpark to the left of Roadchef building.

Facilities

HotelRestaurantCaféShoppingNatureFuel stationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS240 kW92p per kWh
CCS40 kW92p per kWh
CHAdeMO40 kW92p per kWh
Type 222 kW92p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 240 kW CCS~22 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 240 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 240 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 240 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 240 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 240 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 40 kW CHAdeMO~58 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - Roadchef Killington Lakes (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - Roadchef Killington Lakes (GRIDSERVE)?

Up to 240 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - Roadchef Killington Lakes (GRIDSERVE) have?

11 charging sockets: 3 × 40 kW CCS, 1 × 40 kW CHAdeMO, 1 × 22 kW Type 2, 6 × 240 kW CCS. Live per-socket availability is shown on this page.

Is EH - Roadchef Killington Lakes (GRIDSERVE) open 24/7?

Yes - EH - Roadchef Killington Lakes (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - Roadchef Killington Lakes (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - Roadchef Killington Lakes (GRIDSERVE)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 1949 observed charging sessions.

Who operates EH - Roadchef Killington Lakes?

EH - Roadchef Killington Lakes is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - Roadchef Killington Lakes (GRIDSERVE)?

Murley Moss Business Park (Fuuse) is 4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - Roadchef Killington Lakes (GRIDSERVE)?

A typical 10–80% rapid charge takes about 22 min on the 240 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Roadchef Killington Lakes (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 240 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - Roadchef Killington Lakes (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 240 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.