GRIDSERVE · EV charging site
EH - Roadchef Maidstone
M20, Maidstone, ME17 1SS
EH - Roadchef Maidstone is an EV charging site in Maidstone, Kent, run by GRIDSERVE and open 24 hours a day. Its 11 sockets reach up to 237 kW, with CCS at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 2558 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Maidstone M20, 160 yards away.
Status
11 of 11 available
Checking status…
Connectors
CCS · 237 kW
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Getting there
- To the left of Roadchef entrance.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 237 kW | 92p per kWh |
| CCS | 50 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
| Type 2 | 22 kW | 92p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - Roadchef Maidstone (GRIDSERVE)?
The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - Roadchef Maidstone (GRIDSERVE)?
Up to 237 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - Roadchef Maidstone (GRIDSERVE) have?
11 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 6 × 237 kW CCS. Live per-socket availability is shown on this page.
Is EH - Roadchef Maidstone (GRIDSERVE) open 24/7?
Yes - EH - Roadchef Maidstone (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - Roadchef Maidstone (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - Roadchef Maidstone (GRIDSERVE)?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 2558 observed charging sessions.
Who operates EH - Roadchef Maidstone?
EH - Roadchef Maidstone is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - Roadchef Maidstone (GRIDSERVE)?
IONITY GmbH IONITY Maidstone M20 is 160 yards away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - Roadchef Maidstone (GRIDSERVE)?
A typical 10–80% rapid charge takes about 22 min on the 237 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Roadchef Maidstone (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 237 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - Roadchef Maidstone (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 237 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- IONITY GmbH IONITY Maidstone M20
- The Black Horse Inn
- The Wellie Boot Pub Company Ltd
- The Wellie Boot Pub Company Ltd
- Pod Point Maidstone Innovation Centre
- M&S Maidstone
- Cheapest nearby
- Pod Point Maidstone Innovation Centre · 39.6p per kWh · 7 kW · 2.8 mi
- Fastest nearby
- IONITY GmbH IONITY Maidstone M20 · 350 kW · 160 yd