Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

IONITY · EV charging site

IONITY GmbH IONITY Maidstone M20

Motorway M20, Maidstone, ME17 1SS

IONITY GmbH IONITY Maidstone M20 is an EV charging site in Maidstone, Kent, run by IONITY and open 24 hours a day. All 4 of its sockets are 350 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 1113 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - Roadchef Maidstone (GRIDSERVE), 160 yards away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from Ionity’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 350 kW4 connectors · 89p per kWh2 free2 in use
01100% reliabilityAvailable
02100% reliabilityAvailable
03100% reliabilityCharging
04100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
IONITY
Opening hours
Open 24 hours
Payment
In the IONITY appRFID card
Charger ID
01
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS350 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IONITY GmbH IONITY Maidstone M20?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IONITY GmbH IONITY Maidstone M20?

Up to 350 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Maidstone M20 have?

4 charging sockets: 4 × 350 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Maidstone M20 open 24/7?

Yes - IONITY GmbH IONITY Maidstone M20 is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Maidstone M20 busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Maidstone M20?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1113 observed charging sessions.

Who operates IONITY GmbH IONITY Maidstone M20?

IONITY GmbH IONITY Maidstone M20 is on the IONITY network.

Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Maidstone M20?

EH - Roadchef Maidstone (GRIDSERVE) is 160 yards away in a straight line, with up to 237 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Maidstone M20?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Maidstone M20?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Maidstone M20?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.