Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ElectRoad · EV charging site

The Jubilee Centre

Walpole Crescent, Bowthorpe, NR4 6TU

The Jubilee Centre is an EV charging site in Bowthorpe, Norfolk, run by ElectRoad. Its 8 sockets reach up to 45 kW, with CCS and CHAdeMO at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is IONITY GmbH IONITY Cringleford, 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Mar 2025Last verified 4 Mar 2025

Connectors

CCS · 45 kW1 connector
CHAdeMO · 45 kW1 connector
Type 2 · 22 kW6 connectors

Site information

Operator
ElectRoad
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 45 kW CCS~78 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 45 kW CCS~56 min
Audi Q4 e-tron 50 10–80% · 45 kW CCS~73 min
Hyundai IONIQ 5 10–80% · 45 kW CCS~71 min
MG Motor MG4 Trophy 10–80% · 45 kW CCS~60 min
Hyundai Kona Electric Long Range 10–80% · 45 kW CCS~60 min
Nissan LEAF 10–80% · 45 kW CHAdeMO~56 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at The Jubilee Centre (ElectRoad)?

Up to 45 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does The Jubilee Centre (ElectRoad) have?

8 charging sockets: 1 × 45 kW CCS, 1 × 45 kW CHAdeMO, 6 × 22 kW Type 2.

Who operates The Jubilee Centre?

The Jubilee Centre is on the ElectRoad network.

Where is the nearest charger with 50 kW or more to The Jubilee Centre (ElectRoad)?

IONITY GmbH IONITY Cringleford is 0.3 miles away in a straight line, with up to 350 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Jubilee Centre (ElectRoad)?

A typical 10–80% rapid charge takes about 78 min on the 45 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Jubilee Centre (ElectRoad)?

A typical 10–80% rapid charge takes about 56 min on the 45 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Jubilee Centre (ElectRoad)?

A typical 10–80% rapid charge takes about 73 min on the 45 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Mar 2025

Amp Map does not take payment. You pay the operator.