Evolt · EV charging site
NRP Public Carpark Customer Charging
NRP Public Carpark, Bowthorpe, NR4 7UQ
NRP Public Carpark Customer Charging is an EV charging site in Bowthorpe, Norfolk, run by Evolt. Its 18 sockets reach up to 22 kW, with Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The village inn (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.30 / kWh. Parking fees apply(from Open Charge Map, 26 Aug 2021)
- Phone (from Open Charge Map)
- +448082813508
- Notes
- Payment via https://webpay.swarcoeconnect.org/ or membership RFIDs
- Getting there
- Entry via west-side of multi-storey car park, 6 charging bays each on floors 1, 2 and 3
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at NRP Public Carpark Customer Charging (Evolt)?
The listed price is £0.30 / kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at NRP Public Carpark Customer Charging (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does NRP Public Carpark Customer Charging (Evolt) have?
18 charging sockets: 18 × 7 kW Type 2, 18 × 22 kW Type 2.
Who operates NRP Public Carpark Customer Charging?
NRP Public Carpark Customer Charging is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to NRP Public Carpark Customer Charging (Evolt)?
The village inn (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at NRP Public Carpark Customer Charging (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NRP Public Carpark Customer Charging (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NRP Public Carpark Customer Charging (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ella May
- Norwich Research Park Car Park 1
- The village inn
- Norwich Enterprise Centre
- IONITY GmbH IONITY Cringleford
- The Jubilee Centre
- Cheapest nearby
- IONITY GmbH IONITY Cringleford · 89p per kWh · 350 kW · 1.1 mi
- Fastest nearby
- IONITY GmbH IONITY Cringleford · 350 kW · 1.1 mi