Enel X · EV charging site
Bicester Shopping Village
144a Pingle Drive, Bicester, OX26 6EU
Bicester Shopping Village is an EV charging site in Bicester, Oxfordshire, run by Enel X. All 5 of its sockets are 7 kW Type 2, and the price is listed as 0.00. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Bicester (75kW), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Enel X
- Opening hours
- Not published
- Access
- Public
- Price
- 0.00(from Open Charge Map, 20 Sept 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bicester Shopping Village (Enel X)?
The listed price is 0.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Bicester Shopping Village (Enel X)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bicester Shopping Village (Enel X) have?
5 charging sockets: 1 × 7 kW Type 2.
Who operates Bicester Shopping Village?
Bicester Shopping Village is on the Enel X network.
Where is the nearest charger with 50 kW or more to Bicester Shopping Village (Enel X)?
Pod Point Tesco Superstore - Bicester (75kW) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bicester Shopping Village (Enel X)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bicester Shopping Village (Enel X)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bicester Shopping Village (Enel X)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Bicester (75kW)
- Bicester Gateway
- Pod Point Bicester Avenue Garden Centre
- Bicester Shopping Village Car Park
- Holiday Inn Express Bicester
- Holiday Inn Express Bicester
- Cheapest nearby
- Pod Point Bicester Avenue Garden Centre · 31.2p per kWh · 7 kW · 0.4 mi
- Fastest nearby
- Pod Point Tesco Superstore - Bicester (75kW) · 75 kW · 0.2 mi