Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Tesco Superstore - Bicester (75kW)

Lakeview Drive, Bicester, OX26 1DE

Pod Point Tesco Superstore - Bicester (75kW) is an EV charging site in Bicester, Oxfordshire, run by Pod Point. Its 6 sockets reach up to 75 kW, with CCS at the top speed, and published prices run from £0.44 to £0.70 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 1042 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Holm Square - Bicester (POGO), 1.5 miles away.

Status

All 6 in use

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 69.6p per kWh2 in use
Krew-Evin97% reliabilityCharging
Krew-Evin97% reliabilityCharging
Type 2 · 7 kW4 connectors · 44.4p per kWh4 in use
Leah-Rich100% reliabilityCharging
Leah-Rich100% reliabilityCharging
Skye-Cruz100% reliabilityCharging
Skye-Cruz100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
Contactless card at the chargerIn the Pod Point app
Charger ID
Krew-Evin
Getting there
EV charging is only permitted during the car parks specified opening hours, parking charges may apply, please check for signage at the store.

Facilities

SupermarketTesco

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW69.6p per kWh
Type 27 kW44.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£38
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£28
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£36
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£35
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£30
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£28
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£12

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Tesco Superstore - Bicester (75kW)?

The listed price is Type 2 £0.44/kWh · CCS £0.70/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Tesco Superstore - Bicester (75kW)?

Up to 75 kW DC via Type 2, CCS.

How many charging sockets does Pod Point Tesco Superstore - Bicester (75kW) have?

6 charging sockets: 4 × 7 kW Type 2, 2 × 75 kW CCS. Live per-socket availability is shown on this page.

When is Pod Point Tesco Superstore - Bicester (75kW) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Tesco Superstore - Bicester (75kW)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 1042 observed charging sessions.

Who operates Pod Point Tesco Superstore - Bicester (75kW)?

Pod Point Tesco Superstore - Bicester (75kW) is on the Pod Point network.

Where is the nearest other charger with 50 kW or more to Pod Point Tesco Superstore - Bicester (75kW)?

Holm Square - Bicester (POGO) is 1.5 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Superstore - Bicester (75kW)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Superstore - Bicester (75kW)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Superstore - Bicester (75kW)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.