Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Enozzle Ltd - The George Hotel site · EV charging site

Enozzle Ltd - The George Hotel site

Devonshire St, Penrith, CA11 7SU

Enozzle Ltd - The George Hotel site is an EV charging site in Penrith, Cumbria, run by Enozzle Ltd - The George Hotel site and open 24 hours a day. All 3 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 15 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Morrisons Penrith (MFG EV Power), 0.1 miles away.

Status

2 of 3 available

Checking status…

VerifiedLive status and details from Enozzle Ltd - The George Hotel site’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW3 connectors2 free1 in use
ENOZZLE ID:10100% reliabilityCharging
ENOZZLE ID:12100% reliabilityAvailable
ENOZZLE ID: 11100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
In the operator's appRFID card
Charger ID
ENOZZLE ID:10
Bays
EV-only bays

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Enozzle Ltd - The George Hotel site?

Up to 7 kW AC via Type 2.

How many charging sockets does Enozzle Ltd - The George Hotel site have?

3 charging sockets: 3 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Enozzle Ltd - The George Hotel site open 24/7?

Yes - Enozzle Ltd - The George Hotel site is open 24 hours a day, 7 days a week.

When is Enozzle Ltd - The George Hotel site busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 2 pm. The live status on this page shows what is free before you set off.

How reliable is Enozzle Ltd - The George Hotel site?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.

Who operates Enozzle Ltd - The George Hotel site?

Enozzle Ltd - The George Hotel site is on the Enozzle Ltd - The George Hotel site network.

Where is the nearest charger with 50 kW or more to Enozzle Ltd - The George Hotel site?

MFG Morrisons Penrith (MFG EV Power) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Enozzle Ltd - The George Hotel site?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Enozzle Ltd - The George Hotel site?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Enozzle Ltd - The George Hotel site?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Enozzle Ltd - The George Hotel site · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.