Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EO Charging · EV charging site

Eden Housing Association CMS

Blain House, Penrith, CA11 8JB

Eden Housing Association CMS is an EV charging site in Penrith, Cumbria, run by EO Charging. Both of its sockets are 22 kW Type 2, and the price is listed as 27p - 40p. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Morrisons Penrith (MFG EV Power), 0.6 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 23 Apr 2022Last verified 23 Apr 2022

Connectors

Type 2 · 22 kW2 connectors

Site information

Operator
EO Charging
Opening hours
Not published
Access
Public
Price
27p - 40p(from Open Charge Map, 23 Apr 2022)
Phone (from Open Charge Map)
+44 333 772 0383

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Eden Housing Association CMS (EO Charging)?

The listed price is 27p - 40p. Prices can change, so check the price at the charger before you start.

How fast is charging at Eden Housing Association CMS (EO Charging)?

Up to 22 kW AC via Type 2.

How many charging sockets does Eden Housing Association CMS (EO Charging) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

Who operates Eden Housing Association CMS?

Eden Housing Association CMS is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.

Where is the nearest charger with 50 kW or more to Eden Housing Association CMS (EO Charging)?

MFG Morrisons Penrith (MFG EV Power) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 23 Apr 2022