EO Charging · EV charging site
Dent Parish Car Park
Dent Car Park Dent Memorial Hall, Kendal, LA10 5QJ
Dent Parish Car Park is an EV charging site in Kendal, Cumbria, run by EO Charging. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Killington Lakes (GRIDSERVE), 7.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 333 772 0383
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dent Parish Car Park (EO Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dent Parish Car Park (EO Charging) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Dent Parish Car Park?
Dent Parish Car Park is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Where is the nearest charger with 50 kW or more to Dent Parish Car Park (EO Charging)?
EH - Roadchef Killington Lakes (GRIDSERVE) is 7.7 miles away in a straight line, with up to 240 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dent Parish Car Park (EO Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dent Parish Car Park (EO Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dent Parish Car Park (EO Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.