ESB Ecars · EV charging site
Albert Street Cap Park
McCay Court, Castlederg, BT81 7AT
Albert Street Cap Park is an EV charging site in Castlederg, Derry City and Strabane, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is The Fir Trees Hotel (ESB Ecars), 8.5 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Albert Street Cap Park (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does Albert Street Cap Park (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Albert Street Cap Park?
Albert Street Cap Park is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to Albert Street Cap Park (ESB Ecars)?
The Fir Trees Hotel (ESB Ecars) is 8.5 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Albert Street Cap Park (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Albert Street Cap Park (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Albert Street Cap Park (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.