Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ESB Ecars · EV charging site

Donard Car Park

Donard Car Park, Newcastle, BT33 0SE

Donard Car Park is an EV charging site in Newcastle, Newry Mourne and Down, run by ESB Ecars. Both of its sockets are 100 kW CCS. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lidl, 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 28 Aug 2026Last verified 28 Aug 2026

Connectors

CCS · 100 kW2 connectors

Site information

Operator
ESB Ecars
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
1890 372 387

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Donard Car Park (ESB Ecars)?

Up to 100 kW DC via CCS.

How many charging sockets does Donard Car Park (ESB Ecars) have?

2 charging sockets: 2 × 100 kW CCS.

Who operates Donard Car Park?

Donard Car Park is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.

Where is the nearest other charger with 50 kW or more to Donard Car Park (ESB Ecars)?

Lidl is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Donard Car Park (ESB Ecars)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Donard Car Park (ESB Ecars)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Donard Car Park (ESB Ecars)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 28 Aug 2026

Amp Map does not take payment. You pay the operator.