ESB Ecars · EV charging site
DRD Car Park Scotch Street South
8-9 Scotch Street Centre, Dungannon, BT70 1BD
DRD Car Park Scotch Street South is an EV charging site in Dungannon, Mid Ulster, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is HRL Ranfurly (BP Pulse), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at DRD Car Park Scotch Street South (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does DRD Car Park Scotch Street South (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates DRD Car Park Scotch Street South?
DRD Car Park Scotch Street South is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to DRD Car Park Scotch Street South (ESB Ecars)?
HRL Ranfurly (BP Pulse) is 0.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at DRD Car Park Scotch Street South (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DRD Car Park Scotch Street South (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at DRD Car Park Scotch Street South (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Dungannon
- Gormley Motors
- South Tyrone Hospital
- Oak Shopping Centre, Dungannon
- HRL Ranfurly
- Dungannon, UK
- Cheapest nearby
- Dungannon, UK · 25p per kWh · 250 kW · 1.3 mi
- Fastest nearby
- Dungannon, UK · 250 kW · 1.3 mi