Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Gormley Motors · EV charging site

Gormley Motors

17 Ballygawley Rd, Dungannon, BT71 7BU

Gormley Motors is an EV charging site in Dungannon, Mid Ulster, run by Gormley Motors and open Mon–Fri 17:00–07:00. It has a single 22 kW Type 2 socket. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is HRL Ranfurly (BP Pulse), 1.3 miles away.

Status

1 of 1 available

Checking status…

VerifiedLive status and details from Gormley Motors’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW1 connector1 free
EV 1 A100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Mon–Fri 17:00–07:00
Parking
Car park
Payment
In the operator's appRFID card
Charger ID
EV 1 A

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Gormley Motors?

Up to 22 kW AC via Type 2.

How many charging sockets does Gormley Motors have?

1 charging socket: 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Gormley Motors open?

Opening hours: Mon–Fri 17:00–07:00.

When is Gormley Motors busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Gormley Motors?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.

Who operates Gormley Motors?

Gormley Motors is on the Gormley Motors network.

Where is the nearest charger with 50 kW or more to Gormley Motors?

HRL Ranfurly (BP Pulse) is 1.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Gormley Motors?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gormley Motors?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Gormley Motors?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Gormley Motors · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.