Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ESB Ecars · EV charging site

Quay Lane North Car Park

Quay Lane North, Enniskillen, BT74 6AG

Quay Lane North Car Park is an EV charging site in Enniskillen, Fermanagh and Omagh, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Belmore Court & Motel (Weev), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 20 Oct 2024Last verified 20 Oct 2024

Connectors

Type 2 · 22 kW2 connectors

Site information

Operator
ESB Ecars
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
1890 372 387

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Quay Lane North Car Park (ESB Ecars)?

Up to 22 kW AC via Type 2.

How many charging sockets does Quay Lane North Car Park (ESB Ecars) have?

2 charging sockets: 2 × 22 kW Type 2.

Who operates Quay Lane North Car Park?

Quay Lane North Car Park is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.

Where is the nearest charger with 50 kW or more to Quay Lane North Car Park (ESB Ecars)?

Belmore Court & Motel (Weev) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Quay Lane North Car Park (ESB Ecars)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quay Lane North Car Park (ESB Ecars)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Quay Lane North Car Park (ESB Ecars)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 20 Oct 2024

Amp Map does not take payment. You pay the operator.