Weev · EV charging site
Belmore Court & Motel
Tempo Road, Enniskillen, BT74 6HX
Belmore Court & Motel is an EV charging site in Enniskillen, Fermanagh and Omagh, run by Weev. Its 5 sockets reach up to 120 kW, with CCS at the top speed. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Killyhevlin Lakeside Hotel & Lodges (Weev), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Belmore Court & Motel (Weev)?
Up to 120 kW DC via Type 2, CCS.
How many charging sockets does Belmore Court & Motel (Weev) have?
5 charging sockets: 3 × 7 kW Type 2, 2 × 120 kW CCS.
Who operates Belmore Court & Motel?
Belmore Court & Motel is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to Belmore Court & Motel (Weev)?
Killyhevlin Lakeside Hotel & Lodges (Weev) is 1 mile away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Belmore Court & Motel (Weev)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belmore Court & Motel (Weev)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Belmore Court & Motel (Weev)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.