ESB Energy · EV charging site
37 – 39 Southgate Road
37 – 39 Southgate Road, near junction with Canal Walk, Islington, N1 3JP
37 – 39 Southgate Road is an EV charging site in Islington, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 163 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hoxton Street (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 37 – 39 Southgate Road (ESB Energy)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does 37 – 39 Southgate Road (ESB Energy) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates 37 – 39 Southgate Road?
37 – 39 Southgate Road is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to 37 – 39 Southgate Road (ESB Energy)?
Hoxton Street (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 37 – 39 Southgate Road (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 37 – 39 Southgate Road (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 37 – 39 Southgate Road (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ufton Road
- Almorah Road 1a
- Sherborne Street
- Southgate Road
- Almorah Road 56
- ubitricity Distributed Energy Systems UK Ltd. 20 Wilton Square
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 20 Wilton Square · 56p per kWh · 5 kW · 0.2 mi