Total Energies · EV charging site
Ufton Road
4a Ufton Road, Islington, N1 5BY
Ufton Road is an EV charging site in Islington, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 156 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 37 – 39 Southgate Road (ESB Energy), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 3 Aug 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ufton Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Ufton Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Ufton Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Ufton Road?
Ufton Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Ufton Road (Total Energies)?
37 – 39 Southgate Road (ESB Energy) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ufton Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ufton Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ufton Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Southgate Road
- 37 – 39 Southgate Road
- Almorah Road 56
- ubitricity Distributed Energy Systems UK Ltd. 46 De Beauvoir Crescent, opp.
- Almorah Road 1a
- ubitricity Distributed Energy Systems UK Ltd. 24 Whitmore Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 46 De Beauvoir Crescent, opp. · 67p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- 37 – 39 Southgate Road · 50 kW · 0.1 mi