ESB Energy · EV charging site
401 Battersea Park Road (opp 154A)
401 Battersea Park Road (opp 154A), Battersea Park, SW11 4XW
401 Battersea Park Road (opp 154A) is an EV charging site in Battersea, Greater London, run by ESB Energy. Both of its sockets are 50 kW CHAdeMO and Type 2. 113 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 261 Battersea Park Road (ESB Energy), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 401 Battersea Park Road (opp 154A) (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does 401 Battersea Park Road (opp 154A) (ESB Energy) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates 401 Battersea Park Road (opp 154A)?
401 Battersea Park Road (opp 154A) is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to 401 Battersea Park Road (opp 154A) (ESB Energy)?
261 Battersea Park Road (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 401 Battersea Park Road (opp 154A) (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 401 Battersea Park Road (opp 154A) (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 401 Battersea Park Road (opp 154A) (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Opp Overstrand mansions Prince of Wales Driv
- Culvert Road
- 28 Prince of Wales Drive
- ubitricity Distributed Energy Systems UK Ltd. Opp Overstrand mansions Prince of Wales Drive
- ubitricity Distributed Energy Systems UK Ltd. Charlotte Despard Avenue, Junc. Austin Road
- ubitricity Distributed Energy Systems UK Ltd. 2 Francis Chichester Way, Junc. Charlotte Des
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Opp Overstrand mansions Prince of Wales Driv · 45p per kWh · 5 kW · 160 yd