Total Energies · EV charging site
28 Prince of Wales Drive
28 Prince of Wales Drive, Battersea, SW11 4SF
28 Prince of Wales Drive is an EV charging site in Battersea, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 150 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 401 Battersea Park Road (opp 154A) (ESB Energy), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 29 Dec 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 28 Prince of Wales Drive (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 28 Prince of Wales Drive (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does 28 Prince of Wales Drive (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates 28 Prince of Wales Drive?
28 Prince of Wales Drive is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 28 Prince of Wales Drive (Total Energies)?
401 Battersea Park Road (opp 154A) (ESB Energy) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 28 Prince of Wales Drive (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 28 Prince of Wales Drive (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 28 Prince of Wales Drive (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Opp Overstrand mansions Prince of Wales Driv
- ubitricity Distributed Energy Systems UK Ltd. 12 Rosenau Road London England SW11 4QN GB
- 401 Battersea Park Road (opp 154A)
- ubitricity Distributed Energy Systems UK Ltd. 38 Kersley Street England SW11 4PT United Kin
- Culvert Road
- ubitricity Distributed Energy Systems UK Ltd. 39 Kersley Street England SW11 4PR United Kin
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Opp Overstrand mansions Prince of Wales Driv · 45p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- 401 Battersea Park Road (opp 154A) · 50 kW · 0.1 mi