EV Point Moldova · EV charging site
Evpoint Asda Barrow
Asda Barrow, Barrow in Furness, LA14 5UG
Evpoint Asda Barrow is an EV charging site in Barrow in Furness, Cumbria, run by EV Point Moldova. Both of its sockets are 120 kW CCS, and the price is listed as 0.65. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Instavolt Hindpool Retail Park (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EV Point Moldova
- Opening hours
- Not published
- Access
- Public
- Price
- 0.65(from Open Charge Map, 22 Oct 2024)
- Phone (from Open Charge Map)
- +373 60 60 99 00
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Evpoint Asda Barrow (EV Point Moldova)?
The listed price is 0.65. Prices can change, so check the price at the charger before you start.
How fast is charging at Evpoint Asda Barrow (EV Point Moldova)?
Up to 120 kW DC via CCS.
How many charging sockets does Evpoint Asda Barrow (EV Point Moldova) have?
2 charging sockets: 2 × 120 kW CCS.
Who operates Evpoint Asda Barrow?
Evpoint Asda Barrow is on the EV Point Moldova network. For site issues, the operator lists +373 60 60 99 00.
Where is the nearest other charger with 50 kW or more to Evpoint Asda Barrow (EV Point Moldova)?
Instavolt Hindpool Retail Park (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Evpoint Asda Barrow (EV Point Moldova)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Evpoint Asda Barrow (EV Point Moldova)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Evpoint Asda Barrow (EV Point Moldova)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stollers Furniture World Ltd
- Instavolt Hindpool Retail Park
- Pod Point Tesco Extra - Barrow-In-Furness
- Morrisons Barrow-in Furness
- Morrisons, Barrow-in-Furness
- West Point House
- Cheapest nearby
- Pod Point Tesco Extra - Barrow-In-Furness · 44.4p per kWh · 7 kW · 0.6 mi