GeniePoint · EV charging site
Morrisons Barrow-in Furness
The Strand, Barrow in Furness, LA14 2HF
Morrisons Barrow-in Furness is an EV charging site in Barrow in Furness, Cumbria, run by GeniePoint. Its 3 sockets reach up to 60 kW, with Type 2 at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons, Barrow-in-Furness (GeniePoint), 120 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Barrow-in Furness (GeniePoint)?
Up to 60 kW DC via Type 2, CHAdeMO.
How many charging sockets does Morrisons Barrow-in Furness (GeniePoint) have?
3 charging sockets: 1 × 60 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Morrisons Barrow-in Furness?
Morrisons Barrow-in Furness is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Barrow-in Furness (GeniePoint)?
Morrisons, Barrow-in-Furness (GeniePoint) is 120 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Barrow-in Furness (GeniePoint)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Barrow-in Furness (GeniePoint)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Barrow-in Furness (GeniePoint)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons, Barrow-in-Furness
- Instavolt Hindpool Retail Park
- Pod Point Tesco Extra - Barrow-In-Furness
- Evpoint Asda Barrow
- Stollers Furniture World Ltd
- Walney School
- Cheapest nearby
- Pod Point Tesco Extra - Barrow-In-Furness · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Instavolt Hindpool Retail Park · 120 kW · 0.5 mi